USD to LBP Exchange Rate

Buy 1 USD at 89,700 LBP

Sell 1 USD at 89,500 LBP

Sayrafa Rate

Rate 1 USD at 85,500 LBP

Volume 50,000,000 USD

Fuel

Octane 98
25.45 USD
Octane 95
24.50 USD
Gasoline 98
1.48 USD
Gasoline 95
1.42 USD
Brent Crude Oil
109.55 USD

A Practical Step Toward Reopening Qleiaat Airport

  • Sun November 22 2026 12:18 pm

The Ministry of Public Works and Transport and the Civil Aviation Authority announced in a joint statement that technical calibration operations and operational testing of the air navigation systems and visual aids at Qleiaat Airport (President René Mouawad Airport) began today, November 22.

The statement said: These procedures include a thorough assessment of the efficiency of the Precision Approach Path Indicator (PAPI) system, approach and landing procedures, and air traffic management in the airspace surrounding the airport. As previously announced, a series of additional flight inspection test flights will be conducted once the runway’s engineering rehabilitation works have been completed and all necessary technical readiness requirements and operational safety standards have been met.

The ministry and the authority stressed that the project to rehabilitate and reopen Qleiaat Airport has moved from the planning stage to actual implementation and comprehensive engineering works on the ground, in accordance with a carefully devised timetable that ensures the sustainability of the navigation infrastructure.

They also emphasized that this vital and strategic facility is subject, at every stage, to the regulations and standards issued by the International Civil Aviation Organization (ICAO), particularly Annex 14, which governs the design and operation of aerodromes.

They affirmed that aviation security and operational safety are an absolute, non-negotiable priority, with no room for compromise under any circumstances.

News